TY - JOUR
T1 - A two-level production control model with target amount rescheduling
AU - Golenko-Ginzburg, Dmitri
PY - 1990/1/1
Y1 - 1990/1/1
N2 - This paper deals with the problem of two-level production control with disturbances. A production system is considered with several machines on the lower level and a section on the upper one. Each machine produces a given target amount by a given due date (common to all machines). Each machine has several possible speeds, which are subject to disturbances. On the machine level, at the routine control point, decision-making centres on introducing the proper speed and determining the next control point. It is assumed that all the target amounts are transferable; i.e. a part of each target amount can be processed by any other machine. In a case when it is realized, for a certain machine, that the target cannot be completed on time, the section reschedules the remaining target amounts among the machines. New target amounts are determined for the machines so that the overall target can be accomplished on time. A stochastic optimization formulation is presented, followed by a heuristic solution and simulation results.
AB - This paper deals with the problem of two-level production control with disturbances. A production system is considered with several machines on the lower level and a section on the upper one. Each machine produces a given target amount by a given due date (common to all machines). Each machine has several possible speeds, which are subject to disturbances. On the machine level, at the routine control point, decision-making centres on introducing the proper speed and determining the next control point. It is assumed that all the target amounts are transferable; i.e. a part of each target amount can be processed by any other machine. In a case when it is realized, for a certain machine, that the target cannot be completed on time, the section reschedules the remaining target amounts among the machines. New target amounts are determined for the machines so that the overall target can be accomplished on time. A stochastic optimization formulation is presented, followed by a heuristic solution and simulation results.
KW - Optimization
KW - Production speed
KW - Rescheduling
KW - Simulation
KW - Target amount
UR - http://www.scopus.com/inward/record.url?scp=84974861931&partnerID=8YFLogxK
U2 - 10.1057/jors.1990.160
DO - 10.1057/jors.1990.160
M3 - Article
AN - SCOPUS:84974861931
VL - 41
SP - 1021
EP - 1028
JO - Journal of the Operational Research Society
JF - Journal of the Operational Research Society
SN - 0160-5682
IS - 11
ER -