Abstract
This paper illustrates the general structure of a Cost Simulation Model (CSM) for university planning. The relationship between the CSM and the budget planning procedure is described. The various subsystems of the CSM are analyzed. Finally, a survey of the literature is given.
| Original language | English |
|---|---|
| Pages (from-to) | 211-216 |
| Number of pages | 6 |
| Journal | Computers, Environment and Urban Systems |
| Volume | 8 |
| Issue number | 4 |
| DOIs | |
| State | Published - 1 Jan 1983 |
ASJC Scopus subject areas
- Geography, Planning and Development
- Ecological Modeling
- General Environmental Science
- Urban Studies