TY - JOUR
T1 - Estimating the number of control points for production systems with variable speeds
AU - Golenko-Ginzburg, Dmitri
PY - 1989/1/1
Y1 - 1989/1/1
N2 - The problem of production control under variable speeds with disturbances is introduced. Given the target amount needed, the due date and the amount produced up to a routine control point, the decision-maker determines the proper speed and the next control point so that the number of control points will be minimized. Golenko-Ginzburg and Sinuany-Stern [7,8] have suggested a heuristic algorithm to solve this problem. In this paper an analytical estimation of the number of control points is obtained under some specific assumptions.
AB - The problem of production control under variable speeds with disturbances is introduced. Given the target amount needed, the due date and the amount produced up to a routine control point, the decision-maker determines the proper speed and the next control point so that the number of control points will be minimized. Golenko-Ginzburg and Sinuany-Stern [7,8] have suggested a heuristic algorithm to solve this problem. In this paper an analytical estimation of the number of control points is obtained under some specific assumptions.
UR - http://www.scopus.com/inward/record.url?scp=0024648427&partnerID=8YFLogxK
U2 - 10.1016/0167-188X(89)90003-7
DO - 10.1016/0167-188X(89)90003-7
M3 - Article
AN - SCOPUS:0024648427
SN - 0925-5273
VL - 16
SP - 97
EP - 102
JO - International Journal of Production Economics
JF - International Journal of Production Economics
IS - 2
ER -