Abstract
The problem of production control under variable speeds with disturbances is introduced. Given the target amount needed, the due date and the amount produced up to a routine control point, the decision-maker determines the proper speed and the next control point so that the number of control points will be minimized. Golenko-Ginzburg and Sinuany-Stern [7,8] have suggested a heuristic algorithm to solve this problem. In this paper an analytical estimation of the number of control points is obtained under some specific assumptions.
| Original language | English |
|---|---|
| Pages (from-to) | 97-102 |
| Number of pages | 6 |
| Journal | Engineering Costs and Production Economics |
| Volume | 16 |
| Issue number | 2 |
| DOIs | |
| State | Published - 1 Jan 1989 |
ASJC Scopus subject areas
- General Engineering