Abstract
Planning horizon is defined as the forward time window for which the incoming products are known. Its influence on manufacturing lead time (MLT) has been previously studied for systems with non-negligible setup times. Multirobot workcells have negligible setup times and are therefore inherently different. This paper evaluates the effect of planning horizon on MLT in various multi-robot workcells. Simulation results indicate that increased planning horizons improve MLT only for non-stationary part arrival rates. Both system load and flexibility have a statistically significant interaction with the planning horizon. A test case closely modeled after an actual production system, was analyzed both in simulation and in hardware and revealed similar results.
| Original language | English |
|---|---|
| State | Published - 1 Dec 2006 |
| Event | 2006 IIE Annual Conference and Exposition - Orlando, FL, United States Duration: 20 May 2006 → 24 May 2006 |
Conference
| Conference | 2006 IIE Annual Conference and Exposition |
|---|---|
| Country/Territory | United States |
| City | Orlando, FL |
| Period | 20/05/06 → 24/05/06 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- Flexible manufacturing
- Multi-robot
- Planning horizon
ASJC Scopus subject areas
- Industrial and Manufacturing Engineering
Fingerprint
Dive into the research topics of 'Evaluating the influence of planning horizons on the manufacturing lead time of parts in multi-robot workcells'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver