Abstract
An open-loop and closed-loop operating boost-power-stage converter with relatively low damping factor exhibit resonant behavior in transient conditions. Such an undamped transient characteristic introduces overshoot to the control-To-output-variable transfer function, which is also visible in the inductor current transient behavior. Therefore, due to the either too large duty ratio or voltage-reference step change, the inductor current can move from continuous conduction mode to discontinuous conduction mode. That transforms the second-order system into an equivalent first-order dynamic system extending the PV-power settling time significantly and reducing power tracking performance of the system. This paper introduces design guidelines to determine maximum perturbation step size for duty ratio and input-voltage reference under open-loop and closed-loop operation, respectively. Two different closed-loop design examples are considered in this paper, based on the application of pure integral controller with phase margin (PM) close to 90 degrees and proportional-integral-derivative controller with PM close to 40 degrees, respectively. The closed-loop system dynamics is known to be characterized by the dominating poles and zeros, which locate closest to the origin. This means that the closed-loop system can be usually characterized by the well-known second-order transfer function. Therefore, the minimum and maximum overshoot of the inductor current can be well approximated as demonstrated by deterministic analysis and experimental results.
| Original language | English |
|---|---|
| Title of host publication | Proceedings IECON 2017 - 43rd Annual Conference of the IEEE Industrial Electronics Society |
| Publisher | Institute of Electrical and Electronics Engineers |
| Pages | 2485-2491 |
| Number of pages | 7 |
| ISBN (Electronic) | 9781538611272 |
| DOIs | |
| State | Published - 15 Dec 2017 |
| Event | 43rd Annual Conference of the IEEE Industrial Electronics Society, IECON 2017 - Beijing, China Duration: 29 Oct 2017 → 1 Nov 2017 |
Publication series
| Name | Proceedings IECON 2017 - 43rd Annual Conference of the IEEE Industrial Electronics Society |
|---|---|
| Volume | 2017-January |
Conference
| Conference | 43rd Annual Conference of the IEEE Industrial Electronics Society, IECON 2017 |
|---|---|
| Country/Territory | China |
| City | Beijing |
| Period | 29/10/17 → 1/11/17 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
ASJC Scopus subject areas
- Industrial and Manufacturing Engineering
- Control and Optimization
- Energy Engineering and Power Technology
- Electrical and Electronic Engineering
Fingerprint
Dive into the research topics of 'Factors affecting validity of PVG-power settling time estimation in designing MPP-Tracking perturbation frequency'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver