Abstract
This chapter describes a collaborative way of planning and managing the design, production, and on-site assembly processes for NZE communities, and in particular their energy-related technologies. The Cyprus case study, and the Freescoo HVAC system that was installed in it, will be used to describe the proposed planning method as well as the on-site installation procedures.
| Original language | English |
|---|---|
| Title of host publication | Net-Zero and Positive Energy Communities |
| Subtitle of host publication | Best Practice Guidance Based on the ZERO-PLUS Project Experience |
| Publisher | CRC Press |
| Pages | 119-129 |
| Number of pages | 11 |
| ISBN (Electronic) | 9781003811091 |
| ISBN (Print) | 9781032211855 |
| DOIs | |
| State | Published - 1 Jan 2023 |
ASJC Scopus subject areas
- General Engineering
- General Arts and Humanities
Fingerprint
Dive into the research topics of 'Part 2: Production and installation planning'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver