Production control with variable speeds and inspection points

Research output: Contribution to journalArticlepeer-review

15 Scopus citations

Abstract

The problem of production control with disturbances is introduced. Given the target amount needed, the due date and the amount produced up to a certain inspection point, we have to determine the new production speed and the next inspection point so that the minimal speed will guarantee meeting the target points on time on the average. Two objectives are imbedded in this heuristic algorithm: to minimize the number of inspection points, and to maximize the probability of completing the production on the due date. A stochastic optimization formulation is presented followed by a heuristic solution, a numerical example is given, and simulation results are presented.

Original languageEnglish
Pages (from-to)629-636
Number of pages8
JournalInternational Journal of Production Research
Volume27
Issue number4
DOIs
StatePublished - 1 Jan 1989

ASJC Scopus subject areas

  • Strategy and Management
  • Management Science and Operations Research
  • Industrial and Manufacturing Engineering

Fingerprint

Dive into the research topics of 'Production control with variable speeds and inspection points'. Together they form a unique fingerprint.

Cite this