SARAF Phase i linac in 2012

L. Weissman, D. Berkovits, A. Arenshtam, Y. Ben-Aliz, Y. Buzaglo, O. Dudovitch, Y. Eisen, I. Eliahu, G. Feinberg, I. Fishman, I. Gavish, I. Gertz, A. Grin, S. Halfon, D. Har-Even, Y. F. Haruvy, D. Hirschmann, T. Hirsh, Z. Horovitz, B. KaizerD. Kijel, A. Kreisel, G. Lempert, Y. Luner, E. Reinfeld, J. Rodnizki, D. Rubin, Y. Shapiro, G. Shimel, A. Shor, I. Silverman, M. Wolf, E. Zemach

Research output: Contribution to journalArticlepeer-review

13 Scopus citations

Abstract

This report outlines the status of beam operations at the SARAF accelerator during 2012. Performance of various accelerator subsystems, their limiting factors and the recent improvements are presented. The accumulated experience of proton beam operation is summarized. Future prospects are discussed.

Original languageEnglish
Article numberT05004
JournalJournal of Instrumentation
Volume9
Issue number5
DOIs
StatePublished - 1 May 2014
Externally publishedYes

Keywords

  • Accelerator Applications
  • Accelerator Subsystems and Technologies

ASJC Scopus subject areas

  • Instrumentation
  • Mathematical Physics

Fingerprint

Dive into the research topics of 'SARAF Phase i linac in 2012'. Together they form a unique fingerprint.

Cite this