Abstract
We study various single machine scheduling problems with two competing agents, unit processing times and arbitrary integer release dates. The problems differ by the scheduling criterion used by each of the two agents, and by the variant of the bicriteria problem that has to be solved. We prove that when the scheduling criterion of either one of the two agents is of a max-type, then all considered variants of the bicriteria problem are solvable in polynomial time. However, when the two agents have a sum-type of scheduling criterion, several variants of the bicriteria problem become (Formula presented.) -hard.
Original language | English |
---|---|
Pages (from-to) | 145-178 |
Number of pages | 34 |
Journal | Annals of Operations Research |
Volume | 238 |
Issue number | 1-2 |
DOIs | |
State | Published - 1 Mar 2016 |
Keywords
- Arbitrary release dates
- NP-hard
- Single machine scheduling
- Two competing agents
- Unit processing times
ASJC Scopus subject areas
- Decision Sciences (all)
- Management Science and Operations Research