Abstract
We present a new set of simulation models, organized in a testbed. The aim of the testbed consists in providing researchers with a platform able to credibly represent the complexity of modern semiconductor manufacturing. The testbed is open to public use, and include so far four models. A high-volume/low-mix model and a low-volume/high-mix model constitutes the foundation of the testbed. Two additional models incorporate the complexity of engineering lots. We conclude this paper by presenting a case study that demonstrates that the third and fourth model can be used to assess the performance of integrated dispatching strategies for production and engineering lots.
Original language | English |
---|---|
Article number | 9115710 |
Pages (from-to) | 522-531 |
Number of pages | 10 |
Journal | IEEE Transactions on Semiconductor Manufacturing |
Volume | 33 |
Issue number | 4 |
DOIs | |
State | Published - 1 Nov 2020 |
Externally published | Yes |
Keywords
- Discrete-event simulation
- production planning and control
- semiconductor manufacturing
- simulation experiments
- testbed
ASJC Scopus subject areas
- Electronic, Optical and Magnetic Materials
- Condensed Matter Physics
- Industrial and Manufacturing Engineering
- Electrical and Electronic Engineering