The just-in-time scheduling problem in a flow-shop scheduling system

Research output: Contribution to journalArticlepeer-review

46 Scopus citations

Abstract

We study the problem of maximizing the weighted number of just-in-time (JIT) jobs in a flow-shop scheduling system under four different scenarios. The first scenario is where the flow-shop includes only two machines and all the jobs have the same gain for being completed JIT. For this scenario, we provide an O(n3) time optimization algorithm which is faster than the best known algorithm in the literature. The second scenario is where the job processing times are machine-independent. For this scenario, the scheduling system is commonly referred to as a proportionate flow-shop. We show that in this case, the problem of maximizing the weighted number of JIT jobs is NP-hard in the ordinary sense for any arbitrary number of machines. Moreover, we provide a fully polynomial time approximation scheme (FPTAS) for its solution and a polynomial time algorithm to solve the special case for which all the jobs have the same gain for being completed JIT. The third scenario is where a set of identical jobs is to be produced for different customers. For this scenario, we provide an O(n3) time optimization algorithm which is independent of the number of machines. We also show that the time complexity can be reduced to O(n log n) if all the jobs have the same gain for being completed JIT. In the last scenario, we study the JIT scheduling problem on m machines with a no-wait restriction and provide an O(mn2) time optimization algorithm.

Original languageEnglish
Pages (from-to)521-532
Number of pages12
JournalEuropean Journal of Operational Research
Volume216
Issue number3
DOIs
StatePublished - 1 Feb 2012

Keywords

  • Complexity
  • Flow-shop
  • Just-in-time scheduling
  • No-wait restriction
  • Pseudo-polynomial time algorithm

ASJC Scopus subject areas

  • General Computer Science
  • Modeling and Simulation
  • Management Science and Operations Research
  • Information Systems and Management