Abstract
A PERT-COST type project with random activity duration is considered. The project comprises several essential parameters which practically define the quality of the project as a whole: the budget assigned to the project; the project's due date; the project's reliability, i.e. the probability of meeting the project's due date on time. To establish the quality of the project, the concept of the project's utility is introduced. In order to maximize the project's utility, a three-parametrical harmonization model is developed.
Original language | English |
---|---|
Pages (from-to) | 431-436 |
Number of pages | 6 |
Journal | Mathematics and Computers in Simulation |
Volume | 59 |
Issue number | 5 |
DOIs | |
State | Published - 15 Jun 2002 |
Keywords
- Cyclic coordinate search algorithm
- Project's utility
- Three-parametrical harmonization model
ASJC Scopus subject areas
- Theoretical Computer Science
- General Computer Science
- Numerical Analysis
- Modeling and Simulation
- Applied Mathematics