Abstract
The paper considers the two-machine flow shop and open shop scheduling problems to minimize the makespan, provided that one of the machines is subject to maintenance, which has to start within a prescribed time window. In the case of the flow shop, maintenance is performed on the second machine. A non-resumable setting is considered, i.e., if a job cannot be completed prior to the maintenance, it must restart from scratch after the maintenance. For each of these NP-hard problems we develop a 3/2–approximation algorithm.
Original language | English |
---|---|
Pages (from-to) | 388-400 |
Number of pages | 13 |
Journal | European Journal of Operational Research |
Volume | 271 |
Issue number | 2 |
DOIs | |
State | Published - 1 Dec 2018 |
Externally published | Yes |
Keywords
- Approximation algorithm
- Flow shop
- Machine maintenance start window
- Open shop
- Scheduling
ASJC Scopus subject areas
- General Computer Science
- Modeling and Simulation
- Management Science and Operations Research
- Information Systems and Management